How is Plaster Completed?

9/10/2011

0 Comments

 
Use the base coat plaster product to plaster the walls and ceilings joints, and then wait until the base coat plaster dries. The optimum wait time is approximately 12 hours. However, waiting that long is not essential. You may begin plastering between 40 to 90 minutes, as soon as the base coat plaster hardens. During the final plaster coat, the veneer plaster should not be mixed more then 1 bag ½ per plasterer. It will dry fast and can be very hard to work with. A professional plasterer will need some time to complete the skim coating with one smooth coat finish.

The veneer plaster work does not have to be sanded before painting!

By Frank C.
0 Comments

Your comment will be posted after it is approved.


Leave a Reply.

    get a quote

    Archives:

    March 2023
    February 2023
    May 2022
    March 2022
    April 2020
    February 2018
    July 2017
    September 2011


    Categories:

    All
    Crack Repairs
    Drywall Vs Plaster
    Frequently Asked Questions:
    Hole Repairs
    Textured Vs Smooth Plaster Finish


Boston Plastering LLC
Phone: (617) 701-6060
E-mail: Available Upon Request
Hours of Operation
Mon - Fri: 7:30am - 5:00pm
Sat: 9:00am - 2:00pm​

Follow us

  • HOME
  • SERVICES
    • Drywall
    • Painting
    • Plastering
    • New Construction
    • Basement Finishing
  • SERVICE AREAS
    • Boston
    • MetroWest
    • Worcester
  • REVIEWS
  • GALLERY
  • BLOG
  • ABOUT
  • CONTACT